Throughout the world, mechanized tunnelling is driving the safe and cost-effective creation of key infrastructures. For the initial lining of the bored tubes, concrete segments weighing several tonnes and produced in precision moulds are required. Optimized production of thousands of segments is an integral part of an efficient tunnel jobsite.

 

Herrenknecht Formwork has a high density of first-class project references worldwide. Tailored and integrated solutions – developed in cooperation with the customer – support smooth segment production. Moulds, equipment, services and know-how – everything from a single source if required.

 

Albvorlandtunnel - Germany

For the lining of the 8,176 m long twin tube tunnel between Wendlingen and Kirchheim unter Teck (part of the railway project Stuttgart – Ulm) the construction company Implenia produces 60,000 concrete segments.

TO THE PROJECT

Riyadh Metro Line 1 – Saudi-Arabia

For the production of around 72,000 segments, Herrenknecht Formwork designed, delivered and installed a complete turnkey segment production line.

To the project

Bossler Tunnel – Germany

Moulds from Herrenknecht Formwork for tailor-made carousel production in a field production facility ensure high production rates while reducing labor costs

To the project

Rio de Janeiro Metro Line 4 – Brazil

World champion performance: to meet the project's tight schedule, Herrenknecht Formwork produced and delivered a production-ready carousel plant to Copacabana in just ten weeks.

To the project

Klang Valley MRT Kuala Lumpur – Malaysia

The Kuala Lumpur segment production with 20 mould sets from Herrenknecht Formwork provides highly reliable supply to the drives of up to ten TBMs at once.

To the project

Ejpovice Tunnel – Czech Republic

With an inner diameter of 8,7 meters, the 4 km long tunnel between Rokycany and Pilsen is the longest tunnel with segmental lining in the Czech Republic.

To the project

West Trunk Sewer P2 Mississauga, Canada

In one-pass segmental lining with Combisegments®, no joints need to be welded.

To the project

Filder Tunnel - Germany

More than 54,000 reinforced concrete segments have been installed in the approx. 10 km long Filder Tunnel. With 42 precision moulds and a sophisticated handling concept Herrenknecht Formwork contributed to a reliable production of the segments.

To the project

"We experienced the team from Schwanau to a realiable partner, either regarding quality and delivery time as well as flexibility and adaptation to special requirements."

Paul Freudiger, Project Manager, Marti Tunnelbau AG

"After 4 successful events, the FORMWORK DAYS established themselves to become a platform for segments production throughout Europe estimated by clients, designers, contractors and suppliers."

Philipp Häfliger, Head of Underground Construction, Walo Bertschinger AG

"We have decided to work with a complete segment production plant with high-precision moulds by Herrenknecht Formwork. During operation of the plant, we had only one contact person right from the beginning."

Norbert Stricker, Arge PTS Boßlertunnel

"A successful segment production mainly depends on careful maintenance of the equipment. Herrenknecht Formwork offers perfect support."

Dipl.-Ing. Andreas Lange, STRABAG SE, Head of the segment production for the project KAT2

"DUE TO THE  PARTNER-LIKE PLANNING AND TECHNICAL EQUIPMENT IN COOPERATION WITH HERRENKNECHT FORMWORK WE COULD REALIZE A COMPLETE SEGMENT PRODUCTION PLANT READY FOR PRODUCTION WITHIN A FEW MONTHS ONLY."

Implenia Construction GmbH, Segment Plant Albvorlandtunnel

"COMBISEGMENTS® ARE NOT ONLY A RELIABLE ONE PASS TUNNELLING SYSTEM, THEY ALSO INCREASE PRODUCTION IN COMPARISON TO ALTERNATIVE METHODS."

Tony DiMillo, President, Technicore Underground

"THE EXPERTS OF HERRENKNECHT FORMWORK REALIZED THE DESIGN OF THE SEGMENT FACTORY WITH GREAT COMMITMENT ACCORDING TO OUR NEEDS."

Agustín Guastavino, Project Engineer, Consorcio Roggio - Cartellone - Supercemento