We are there, where you face complex challenges in tunnel construction

Throughout the world, mechanized tunnelling is driving the safe and cost-effective creation of key infrastructures. For the initial lining of the bored tubes, concrete segments weighing several tonnes and produced in precision moulds are required. Optimized production of thousands of segments is an integral part of an efficient tunnel jobsite.

 

Herrenknecht Formwork has a high density of first-class project references worldwide. Tailored and integrated solutions – developed in cooperation with the customer – support smooth segment production. Moulds, equipment, services and know-how – everything from a single source if required.

 

Gotthard Road Tunnel, 2nd Tube - Switzerland

Maximum performance with minimum manpower: segment production at the highest level of automation with consistent quality and a reliable, optimized workflow.

TO THE PROJECT

Brenner Base Tunnel - Austria

International standards in tunnel construction: HERRENKNECHT FORMWORK supplies formwork technology for several construction lots of the Brenner Base Tunnel – the future longest railway tunnel in the world.

To the project

Sarner Aa Flood relief - Switzerland

The Sarner Aa project demonstrates how intelligent automation increases productivity and flexibility in segment production – with minimal personnel and future-proof plant technology.

To the project

Kühtai - Austria

A highly automated segment production plant at over 2,000 m above sea level in the middle of a popular ski resort: HERRENKNECHT FORMWORK made this happen with, among other things, fully automatic operation of the moulds using hydraulics

To the project

Gotthard Access Tunnel - Switzerland

For the Gotthard access tunnel, MARTI Tunnel AG and Herrenknecht Formwork implemented a highly automated segment production – featuring hydraulics, robotics and AI.

To the project

Albvorlandtunnel - Germany

More than 60,000 segments for the Albvorland Tunnel were produced in close partnership with the customer – with a fully equipped field factory ready for operation in just six months.

To the project

Riyadh Metro Line 1 – Saudi-Arabia

For the production of around 72,000 segments, Herrenknecht Formwork designed, delivered and installed a complete turnkey segment production line.

To the project

Bossler Tunnel – Germany

Moulds from Herrenknecht Formwork for tailor-made carousel production in a field production facility ensure high production rates while reducing labor costs

To the project

Rio de Janeiro Metro Line 4 – Brazil

World champion performance: to meet the project's tight schedule, Herrenknecht Formwork produced and delivered a production-ready carousel plant to Copacabana in just ten weeks.

To the project

Klang Valley MRT Kuala Lumpur – Malaysia

The Kuala Lumpur segment production with 20 mould sets from Herrenknecht Formwork provides highly reliable supply to the drives of up to ten TBMs at once.

To the project

Ejpovice Tunnel – Czech Republic

With an inner diameter of 8,7 meters, the 4 km long tunnel between Rokycany and Pilsen is the longest tunnel with segmental lining in the Czech Republic.

To the project

West Trunk Sewer P2 Mississauga, Canada

In one-pass segmental lining with Combisegments®, no joints need to be welded.

To the project

Filder Tunnel - Germany

More than 54,000 reinforced concrete segments have been installed in the approx. 10 km long Filder Tunnel. With 42 precision moulds and a sophisticated handling concept Herrenknecht Formwork contributed to a reliable production of the segments.

To the project

"We experienced the team from Schwanau to a realiable partner, either regarding quality and delivery time as well as flexibility and adaptation to special requirements."

Paul Freudiger, Project Manager, Marti Tunnelbau AG

"After 4 successful events, the FORMWORK DAYS established themselves to become a platform for segments production throughout Europe estimated by clients, designers, contractors and suppliers."

Philipp Häfliger, Head of Underground Construction, Walo Bertschinger AG

"We have decided to work with a complete segment production plant with high-precision moulds by Herrenknecht Formwork. During operation of the plant, we had only one contact person right from the beginning."

Norbert Stricker, Arge PTS Boßlertunnel

"A successful segment production mainly depends on careful maintenance of the equipment. Herrenknecht Formwork offers perfect support."

Dipl.-Ing. Andreas Lange, STRABAG SE, Head of the segment production for the project KAT2

"DUE TO THE  PARTNER-LIKE PLANNING AND TECHNICAL EQUIPMENT IN COOPERATION WITH HERRENKNECHT FORMWORK WE COULD REALIZE A COMPLETE SEGMENT PRODUCTION PLANT READY FOR PRODUCTION WITHIN A FEW MONTHS ONLY."

Implenia Construction GmbH, Segment Plant Albvorlandtunnel

"COMBISEGMENTS® ARE NOT ONLY A RELIABLE ONE PASS TUNNELLING SYSTEM, THEY ALSO INCREASE PRODUCTION IN COMPARISON TO ALTERNATIVE METHODS."

Tony DiMillo, President, Technicore Underground

"THE EXPERTS OF HERRENKNECHT FORMWORK REALIZED THE DESIGN OF THE SEGMENT FACTORY WITH GREAT COMMITMENT ACCORDING TO OUR NEEDS."

Agustín Guastavino, Project Engineer, Consorcio Roggio - Cartellone - Supercemento