Sochi segment production plant

 

With high speed for Olympia 2014.

The XXII. Winter Olympics will take place from the 7th till the 23rd of February in the Black Sea resort city of Sochi with 330.000 inhabitants. These will be the first Olympics in the subtropical coastal city and the second Olympics in the biggest country of the world in terms of area after the Summer Olympics of 1980 in Moscow. Thus, the Russian government strongly invests in the development of public transport infrastructure. By 2014 a combined railroad and highway will be built between the Black Sea and the skiing region in the Caucasus Mountains. On the distance of 48 km in total, six of the 12 tunnels are mechanically excavated. Herrenknecht Formwork has been responsible for the complete planning and installation of the turnkey segment production on site. Segment production started in October 2009 in Vesyolye (Adler District) and the world's largest segment production plant with a size of 20,000 m² supplies the segments for six tunnels just in time.

Everything from a single source.

Herrenknecht AG is required to start the tunnelling in summer 2010. 2 tunnel boring machines (an EPB-shield with a diameter of 10,630mm and a shield with a diameter of 13,210mm), tunnel vehicles, crane facilities, belt conveyor systems (H+E logistics), guidance systems (VMT) as well as at present the world's largest segment production factory of Herrenknecht Formwork has been supplied. 

Scope of supply:

  • Service, design and layout of the whole concept of the segment production factory in Sochi
  • 3 carousel production lines
  • 3 concrete batching plants with flying bucket and distribution systems in a redundant construction
  • 1 complete reinforcement prefabrication system
  • 2 carousels for reinforcement, welding equipment and jigs
  • 3 heating systems
  • 14 indoor cranes (10-25 tons loading capacity)
  • 1 Segment Documentation System (SDS)
  • 3 semi-automatic evacuation lines
  • 6 vacuum lifting devices
  • 4 mechanical segment clamps