YOUR KEYSTONE TO PERFECTION.

 

Transport of heavy segments, weighing tons, at the push of a button.

Once the segments have been produced, they are temporarily stored, turned and finally transported to the installation site. In these situations, the segments are subjected to differing loading conditions and stresses.

 

Tested safety.

Our equipment has been optimized to the various loading conditions, guaranteeing absolutely safe handling right through to transfer to the tunnel boring machine. Designed in compliance with the applicable CE Directives, including all necessary acceptances, tests and inspections of load lifting gear in the manufacturer’s works.

 

Handling marathon.

We supply the right equipment for all movements:

  • Vacuum lifters and gripper clamps
  • Tilting and turning tables
  • Gasket gluing frames

Have you any question about our product range? We look forward to your e-mail to info(at)herrenknecht-formwork.de, or your call on +49 7824 302 2822

Crane Systems

Crane systems make a significant contribution ‎to productivity. In collaboration with our ‎expert partners, we can develop your crane ‎system.‎